E-S4CON-2025 Practice Exam and Study Guides - Verified By Prep4away Updated 43 Questions [Q18-Q39]

Share

E-S4CON-2025 Practice Exam and Study Guides - Verified By Prep4away Updated 43 Questions

2026 Updated Verified Pass E-S4CON-2025 Study Guides & Best Courses

NEW QUESTION # 18
What do you need to know about the SAP S/4HANA Conversion Guide? Note: There are 2 correct answers to this question.

  • A. It contains a section about the simplification item (SI) checks.
  • B. It explains the database migration option (DMO) of SUM.
  • C. It explains where to find infformation about the custom code analysis.
  • D. It is a operating system-speecific document.

Answer: A,C


NEW QUESTION # 19
Which of the following scenarios dooes Software Update Manager cover? Note: There are 2 correct answers to this question

  • A. New Implementation
  • B. Conversion to SAP S/4HANAA on-premise
  • C. Conversion to SAP S/4HANAA Cloud Private Edition
  • D. Conversion to SAP S/4HANAA Cloud Public Edition

Answer: B,C


NEW QUESTION # 20
What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. SAP S/4HANA Server 2022
  • B. Standalone AS ABAP with SAP BASIS 752
  • C. SAP ECC system from SAP ERP 6.0 EHP 8
  • D. SAP Solution Manager 7.2

Answer: A,B


NEW QUESTION # 21
Which of the following SUM activitiies require a stack XML file calculated by the mainteenance planner? Note: There are 3 correct answers to this question.

  • A. Benchmark tool
  • B. SAP S/4HANA conversion without DMO
  • C. Prerequisite check
  • D. DMO without system update
  • E. SAP S/4HANA conversion inncluding DMO

Answer: B,C,E


NEW QUESTION # 22
You are running an SAP ECC system with SAP BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perfform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.

  • A.
  • B.
  • C.
  • D.
  • E.

Answer: B,C,D


NEW QUESTION # 23
What is the minimum SAP BASIS rellease of an SAP ECC system that can be converted t o an SAP S/4HANA Server 2023?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: D


NEW QUESTION # 24
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a teest cycle?

  • A. EU IMPORT ALL
  • B. EU_CLONE MIG SOT RUN
  • C. EU_CLONE MIG_DT_CREATTE
  • D. EU CLONE MIG_DT_RUN

Answer: D


NEW QUESTION # 25
You are performing an SAP S/4HANA conversion with scenario strategy Standard. Whicch phases are executed during SUM technical dowwntime? Note: There are 2 correct answers to this question.

  • A. TABIM UPG
  • B. PARDIST_SHD
  • C. PARMVNT_UPG
  • D. TABIM_SHADOW_INC

Answer: A,C


NEW QUESTION # 26
How does SUM recognize modificattion adjustment transports from predecessor systemms?

  • A. By searching for transport requests in DIR_TRANS, subdirectory "transport"
  • B. By searching for transport requests that are assigned to project SAP ADJUST
  • C. By searching for transport requests in file umodauto.lst
  • D. By searching for transport requests named <sid>KO<number>

Answer: C


NEW QUESTION # 27
During the upgrade of your developpment system, you run into the adjustment of non-dictionary objects, handled by transaction SPAAU. There you find programs that are shown in statuus "automatic adjustment" (green traffic light).
What will happen with these prograams when you continue with your upgrade without performing any other actions inside your SAP syystem?

  • A. Before continuing with the next phase, SUM asks for a modification adjustmennt transport.
  • B. SUM continues with the next phase, and the coding of your modified objects are set to the new SAP standard.
  • C. SUM refuses to continue unnless you have marked a transport request as modiffication adjustment transport.
  • D. SUM continues with the next phase and your modifications are kept as in the start release.

Answer: A


NEW QUESTION # 28
You are performing an SAP S/4HAN A conversion with DMO. You are using the downtimme-optimized data conversion (DoC).
Which steps can partially be moved to uptime processing? Note: There are 2 correct annswers to this question.

  • A. Software update
  • B. Main import
  • C. Migration
  • D. Conversion

Answer: C,D


NEW QUESTION # 29
You are running an SAP ECC system .
For which of the following activitiess does SUM allow you to use the near-Zero Downtimme Maintenance (nZDM) capabilities? Note: There are 3 correct answers to this question.

  • A. Perform an SAP S/4HANA conversion including DMO.
  • B. Apply SAP Support Packagees.
  • C. Use DMO for SUM.
  • D. Upgrade the SAP system.
  • E. Perform an SAP S/4HANA conversion without DMO.

Answer: B,C,D


NEW QUESTION # 30
Which step can be optimized when you provide the MIGRATE_DT_DURXML file to SUMM?

  • A. Downtime migration
  • B. Downtime conversion
  • C. Silent data migration (SDM)
  • D. Shadow on target creation

Answer: A


NEW QUESTION # 31
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime annd 80 parallel R3load processes during downtime. You have chosen table count verification, but not table contents comparison.
Phase EU_CLONE MIG_DT_RUN is running In the Charts Control Center, you can see 400 process buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?

  • A. There are 40 R3load processses used for copying and 40 R3load processes for taable count verification.
  • B. SUM is still running in uptimme; the 40 defined R3load processes are considered.
  • C. Without table contents commparison, only 40 R3load processes are being started.
  • D. These are 40 pairs of R3load processes, so there are 80 R3load processes running

Answer: D


NEW QUESTION # 32
You performed a custom code checck for an SAP S/4HANA conversion.
In which transactions can you review the results? Note: There are 2 correct answers to this question.

  • A. ATC (ABAP Test Cockpit)
  • B. SAT(Runtime Analysis)
  • C. SE80 (Object Navigator)
  • D. SYCM (Simplification Database Content)

Answer: A,C


NEW QUESTION # 33
What do you need to consider when performing the SI checks for an SAP S/4HANA connversion? Note: There are 2 correct answers to this question.

  • A. You need to build up an SI check framework by applying SAP Notes.
  • B. The Si checks are executed in the development system and the results are trannsported into the subsequent systems.
  • C. The errors from the SI checks must be solved; otherwise, SUM will report an errror.
  • D. You need an SAP system baased on AS ABAP 7.52 or above for the SI check frammework.

Answer: A,C


NEW QUESTION # 34
......

Ultimate Guide to the E-S4CON-2025 - Latest Edition Available Now: https://www.prep4away.com/SAP-certification/braindumps.E-S4CON-2025.ete.file.html

2026 Updated Verified Pass E-S4CON-2025 Exam - Real Questions and Answers: https://drive.google.com/open?id=1MgUfuqPVxroDxS3o8fsdWisdLqdH6XOl