Pass Your E-S4HCON2022 Dumps as PDF Updated on 2021 With 55 Questions [Q28-Q53]

Share

Pass Your E-S4HCON2022 Dumps as PDF Updated on 2021 With 55 Questions

SAP E-S4HCON2022 Real Exam Questions and Answers FREE


SAP E-S4HCON2022 Certification Exam Topics:

Topic AreasTopic Details, Courses, Books
Modification Adjustment 8% - 12%

Perform the modification adjustment with SPDD and SPAU

Handling of an SAP System Landscape 8% - 12%

Describe the handling of the SAP system landscape during SAP S/4HANA conversion and SAP system upgrade

SUM Monitoring and Troubleshooting 8% - 12%

Monitor and troubleshoot the SUM procedure

Manual Activities for SUM 8% - 12%

Describe the necessary manual preparation and follow-on activities for SUM

SUM Execution Part > 12%

Perform the SUM execution part, including DMO

SAP S/4HANA Conversion Prepare Phase > 12%

Describe and perform the actions necessary during the SAP S/4HANA conversion prepare phase

SUM Prepare Part > 12%

Perform the SUM prepare part

Downtime 8% - 12%

Describe the factors influencing downtime and techniques to reduce downtime


 

NEW QUESTION 28
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response:

  • A. In DMO Migration Preparation
  • B. In SUM Parameters
  • C. In SUM Phaselist
  • D. In Process Control Center

Answer: B,D

 

NEW QUESTION 29
During the SUM procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see the reason for the error?
There are 2 correct answers to this question.
Response:

  • A. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory log
  • B. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
  • C. In the corresponding R3trans log files of this phase
  • D. In the job log for the corresponding job in SM37 (Job Overview)

Answer: A,D

 

NEW QUESTION 30
How does SUM recognize modification adjustment transports from predecessor systems?
Please choose the correct answer.
Response:

  • A. By searching for transport requests named <SID>K0<number>
  • B. By searching for transport requests in the file umodauto.Ist
  • C. By searching for transport requests that are assigned to the project SAP_ADJUST
  • D. By searching for transport requests in DIR_TRANS, subdirectory "transport"

Answer: B

 

NEW QUESTION 31
In ICNV. How database operations synchronized between the source and the target table?

  • A. AA
  • B. Deletes are directly executed in the target table by delete trigger.

Answer: B

 

NEW QUESTION 32
Which additional configuration options are offered by SUM when selecting "Switch expert mode on" in main configuration option "Standard"?
There are 2 correct answers to this question.
Response:

  • A. Use the Near Zero Downtime Maintenance Technology (NZDM).
  • B. Reuse a profile for the shadow instance from a previous run.
  • C. Choose the instance number of the shadow instance.
  • D. Keep archiving on during the whole procedure.

Answer: B,C

 

NEW QUESTION 33
Which preparational steps must be performed for an SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response:

  • A. Install add-on SAP Gateway 7.50
  • B. Delete client 066 (Early Watch Client)
  • C. Uninstall Fiori apps not released for SAP_UI 7.50
  • D. Uninstall industry extensions not supported by SAP S/4HANA

Answer: B,C

 

NEW QUESTION 34
You are running an SAP ECC system. For which of the following activities does SUM allow you to use the Near Zero Downtime Maintenance (NZDM) capabilities?
There are 3 correct answers to this question.
Response:

  • A. Use DMO for SUM.
  • B. Apply an Enhancement Package.
  • C. Apply SAP Support Packages.
  • D. Perform an SAP S/4HANA conversion including DMO.
  • E. Upgrade the SAP system.

Answer: B,C,E

 

NEW QUESTION 35
You want to execute a Unicode Conversion only. Which approach do you need to follow?
Please choose the correct answer.
Response:

  • A. SUM without DMO
  • B. SUM with DMO
  • C. SWPM using the Backup / Restore procedure
  • D. SWPM using the Load procedure

Answer: D

 

NEW QUESTION 36
The SUM procedure stops with an error during uptime. How can you identify the current phase, the one in which SUM encountered an error?
There are 2 correct answers to this question.
Response:

  • A. Check the system log (transaction SM21) of the SAP system
  • B. Check the messages shown by the SUM UI
  • C. Check the most recent entries shown in file sapevt.trc
  • D. Check the most recent entries in SAPup.log

Answer: B,D

 

NEW QUESTION 37
What are the benefits of using the Benchmarking option of the DMO for SUM?
There are 2 correct answers to this question.
Response:

  • A. You can find the optimal number of parallel R31oad processes by monitoring host performance.
  • B. You can obtain migration duration files that can be used to optimize the next runs from a previous benchmark run.
  • C. You can record the modification adjustment during migration and use the transports in the next runs.
  • D. You can verify that the content of the download directory matches the stack.XML file.

Answer: A,C

 

NEW QUESTION 38
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.
Response:

  • A. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE
  • B. Import of upgrade and language data from the download directory in phase TABIM UPG
  • C. Activation of dictionary objects in phase ACT_UPG
  • D. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
  • E. Import of dictionary objects from the download directory in phase DDIC_UPG

Answer: B,C,E

 

NEW QUESTION 39
In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?
There are 2 correct answers to this question.

  • A. During downtime
  • B. Post-downtime
  • C. During uptime
  • D. During SPDD

Answer: B,C

 

NEW QUESTION 40
During a DMO procedure with SUM, after which phase is the repository first available on the target database?
Please choose the correct answer.
Response:

  • A. Downtime migration (EU_CLONE_MIG_DT_RUN)
  • B. Shadow repository creation (EU_IMPORT*)
  • C. ParaUel distribution (PARDIST_SHD)
  • D. Uptime migration (EU_CLONE_MIG_UT_RUN)

Answer: D

 

NEW QUESTION 41
You are performing an S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of dictionary objects (SPDD)?
Please choose the correct answer.
Response:

  • A. Credentials of user DDIC in client 000 of the shadow system
  • B. Credentials of a named user in the development client of the development system
  • C. Credentials of user DDIC in the development client of the development system
  • D. Credentials of a named user in client 000 of the shadow system

Answer: D

 

NEW QUESTION 42
During the configuration of the DMO for SUM, how does the tool behave if option "Do not compare table contents" is selected regarding table comparison?
Please choose the correct answer.
Response:

  • A. It performs a comparison on selected tables using check sum.
  • B. It performs a comparison of all tables using check sum.
  • C. It performs a comparison on all tables using row counts.
  • D. It does NOT perform any table comparison.

Answer: C

 

NEW QUESTION 43
ICNV initialization does 3

  • A. AA
  • B. Creation of flag
  • C. Creation of views
  • D. Build index on flag column

Answer: B,C,D

 

NEW QUESTION 44
When using the DMO of SUM, which files can be handled by SUM in the download directory?
There are 2 correct answers to this question.
Response:

  • A. Stack XML file calculated by the Maintenance Planner
  • B. Parameter file SAPup_add.par
  • C. Breakpoint configuration file SAPUPPHAS.BRK
  • D. MIGRATE J5T_DUR_XML file from a previous run

Answer: A,D

 

NEW QUESTION 45
What do you do to prepare the database migration option of a SUM procedure?
There are 3 correct answers
Response:

  • A. Extract the SAP HANA database installation archive
  • B. Move the R3trans update archive into the download folder
  • C. Extract the SAP HANA client installation archive
  • D. Move the SAPM update archive into the download folder
  • E. Move the stack.xml update file into the download folder

Answer: C,D,E

 

NEW QUESTION 46
What is the different between the benchmaking and the repetition option of the Database Migration Option (DMO) of SUM?

  • A. The repetition option allows you to repeat the complete migration
  • B. The benchmaking option allows you to migration a specified set of tables
  • C. The repetition option allows you to run the migration without a shadow system
  • D. The benchmaking option allows you to repeat the uptime migration

Answer: B

 

NEW QUESTION 47
You downloaded content from the SAP note 1000009 ("ASU Toolbox 2008"). Which transaction needs to be executed to use that content in the ASU Toolbox?
Please choose the correct answer.
Response:

  • A. /ASU/SHOW_NOTE (Show SAP Note via Web-Browser)
  • B. /ASU/SSM (ASU Simple Schedule Manager)
  • C. /ASU/START (Start ASU Toolbox)
  • D. /ASU/UPGRADE (Start ASU Toolbox in Upgrade Mode)

Answer: C

 

NEW QUESTION 48
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA.
What do you need to consider? Note: there are 2 correct answers to this question.

  • A. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
  • B. The source system is non-Unicode and the target database is a scale-out system.
  • C. The target database size increases temporarily because of the Shadow Repository.
  • D. Network capacity between exporting and importing R3load processes must be.
  • E. SAP HANA Landscape Reorganization required a manual step to edit a file.

Answer: A,E

 

NEW QUESTION 49
During the upgrade of your development system, you run into the adjustment of non-dictionary objects handled by transaction SPAU There you find programs that are shown in status "automatic adjustment (green traffic tight). What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?

  • A. SUM continues with the next phase and your modifications are kept as In the start release
  • B. SUM refuses to continue unless you have marked a transport request as modification adjustment transport
  • C. Before continuing with the next phase SUM asks for a modification adjustment transport
  • D. SUM continues with the next phase and your modifications are lost

Answer: A

 

NEW QUESTION 50
......


SAP S/4HANA Conversion and SAP System Upgrade Certification Exam Details:

Exam Price$550 (USD)
LevelAssociate
Exam NameSAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade
Sample QuestionsSAP S/4HANA Conversion and SAP System Upgrade Certification Sample Questions
Exam CodeE_S4HCON2022
Duration90 mins
Reference BooksADM328, ADM328 (SAP S/4HANA 2020)
Passing ScoreE_S4HCON2022 - 65%
E_S4HCON2020 - 68%
Schedule ExamSAP Training
Number of Questions40

 

Pass SAP E-S4HCON2022 Exam Info and Free Practice Test: https://www.prep4away.com/SAP-certification/braindumps.E-S4HCON2022.ete.file.html